Ecopare's clients identfy on average 21% savings on their shop floor energy bill.

Ecopare portfolio

We work closely with a number of companies to help them optimise their energy consumption. Here are some results we have achieved for our clients:

Plastics Sector

See our Case Study

Area:Process Lines
Optimisation:Capital replacement of older motors to newer, energy efficient motors.
Outcome:£10,000 per annum plus a deferred investment of up to £60,000 for a new sub-station.

3 process lines showing a 24/5 weekly operation profile with the older machine consuming 30% more energy for a similar task

Metal Fabrication Sector

Area:Heat Treatment Plant
Optimisation:Reduce power during non-working hours to reduce base load.
Outcome:£17,000 per annum savings.

Heat Treatment plant base load reduced by changing work practices

Speciality Printing Sector

Area:Compressed Air
Optimisation:Update working practices to ensure smaller compressor is in operation.
Outcome:Reduction of 62% per annum in facility's energy bill.

Weekly chart showing the energy consumption impact on implementing

Food Processing Sector

Area:Production Line
Optimisation:Change working practice to ensure line is turned off instead of in a standby or waiting mode.
Outcome:£1,600 per annum savings.

A higher cost incurred waiting vs working over a 4 week period

Engineering Sector

Area:CNC machines
Optimisation:Change working practice to ensure CNC is turned off during non-working times.
Outcome:Average saving of £1,200 per annum per CNC machine.

Three CNC Machine's Energy Profile over a 7 day period (Mon 00:00 to Sun 23:59) showing wasted energy from Saturday Midday to Monday 6am.

Horticulture Sector

Area:Hothouse Lighting
Optimisation:Capital replacement of lighting ballast to increase efficiency of converting electricity into light.
Outcome:Identified a saving of 34% per light bulb producing a saving of £7,500 per annum for the oldest hothouse.

Weekly Energy Profile for 3 hothouse's lighting

Automotive Sector

Area:Compressors (fixed vs variable)
Optimisation:Capital replacement of fixed speed to variable speed compressors.
Outcome:37% reduction in energy cost.

Variable speed compressor (in red) reduces energy cost by 37% over a fixed speed compressor (in blue)